National 21 September 2026
Ministry of Defence Signs Rs 586 Crore Contract for Auxiliary Power Units for T-72 & T-90 Tanks

Why in the News?
On September 21, 2026, the Ministry of Defence (MoD) signed a contract worth Rs 586 crore with M/s Accurate Industrial Controls Private Limited in New Delhi for the procurement of Auxiliary Power Units (APUs) for T-72 and T-90 main battle tanks. The agreement was signed in the presence of Defence Secretary Shri Rajesh Kumar Singh.
Key Features / Major Points:
Purpose of APUs: The Auxiliary Power Unit serves as an alternate power source for critical tank equipment, including the Fire Control System, firing circuits, and gun stabilization systems, without needing to run the main engine.
Operational Benefits: Inducting these indigenous APUs will enhance the operational readiness, sustainability, and longevity of the Indian Army's mechanized forces while reducing main engine wear and fuel consumption.
Make-II Success: The procurement represents a major milestone under the industry-led Make-II project category, demonstrating the successful transition of indigenous R&D into full-scale production.
Vision 2047: The initiative aligns with the Union Government's 'Viksit Bharat @2047' vision and boosts self-reliance (Aatmanirbharta) in defence manufacturing.
Static GK Facts:
T-72 (Ajeya) & T-90 (Bhishma): These constitute the primary Main Battle Tanks (MBTs) operated by the Armoured Corps of the Indian Army.
Make-II Category: A scheme under the Defence Acquisition Procedure (DAP) focused on industry-funded research and development for the indigenization of defence equipment and sub-systems.
Defence Secretary of India: Shri Rajesh Kumar Singh (as of September 2026).
One-Liner Quiz (All Competitive Exams):
Q: Which company signed the Rs 586 crore contract with the Ministry of Defence for tank APUs?
A: Accurate Industrial Controls Private Limited
Q: What is the primary function of an Auxiliary Power Unit (APU) in a battle tank?
A: To provide electric power to fire control and electronic systems without running the main engine.
Q: Under which defence procurement category was the APU project developed?
A: Make-II (Industry-led Research and Development)
